In partnership with BlueScope Properties, GH2 Architects and Butler®, FCG builds a 258K sf state-of-the-art reconditioning center for Tricolor Automotive in Surprise, AZ..
Facet Filtration enlisted Fleming 8760 to execute a roof retrofit that would solve for leaks and connect roof planes to improve the overall appearance of the building.
FSE provides structural steel and roofing installation for Jarboe Sales’ 270k square foot distribution center.
Fleming Steel Erectors works through pandemic challenges to complete PEMB construction of USA BMX Headquarters on-time and on-budget.
Frito Lay’s new 83K square foot warehouse in Tulsa, OK, is the latest built-to-suit project in a long partnership between Industrial Developers of Oklahoma and the Fleming Construction Group.
The AAON net zero exploration center includes 10K square feet of showroom space, three stories and 10K square feet of office space, a 7K square foot assembly area, a conference area and lobby.
The relationship between Fleming and ARC, Inc. has spanned over 25 years. The latest execution was an Association of Building Contractors Award Winner that epitomizes the collaborative approach FCG prefers with their select subcontractors.
When Alfa Laval’s 89,000 square-foot ACE plant had exhausted the useful life of its roof, Fleming stepped in with a system designed to eliminate repair and maintenance headaches, while improving both the function and appearance of the buildings.
Fleming Construction Group won the 2019 Industrial Project of the Year Award from the Association of General Contractors for its work on a 73K square foot industrial facility expansion for international heat transfer, separator, and fluid handling technology company, Alfa Laval.
Working with Industrial Developers of Oklahoma (IDO), under expedited timelines and permitting, the Fleming Construction Group built Amazon’s 300K square foot Oklahoma City sortation facility in just eight months from ground breaking to certificate of occupancy.
A visually stunning work of architecture and another exceptional jewel in the network of dealerships owned by the Don Thornton family, this pre-engineered steel building goes way beyond mere functionality.
Fleming helped Braden Manufacturing update their roofing system following a tornado and shoddy repairs with a design that provides them with a 40+ year weathertight roof system and interior workspace enhancements.
Fleming completed upgrades to Braden Shielding’s 45K sq. ft. facility, including updates to the building facade.
Fleming partnered with Industrial Developers of Oklahoma to erect the structural steel pre-engineered metal buildings on the 187-acre former Ford Glass Plant.
Fleming completed the structural steel and roofing portion of an Oklahoma City last mile distribution center, making the 120K sq. ft. project the fifth building partnership between Fleming and the widely recognized global e-commerce company.
Originally constructed by FCG in 1969, Fleming returned to the Green Valley Center for roofing upgrades and modernization of the building facade.
Fleming is proud to have been a part of the construction of the first ever LEED Certified Land Rover automobile dealership.
Fleming erected the structural steel and standing seam roof portion of Skycam’s original 50K sq. ft. headquarters.
In conjunction with Fleming Steel Erectors, Fleming 8760 has installed more than 70-million square feet of Butler® standing seam metal roofing on some of the largest commercial buildings in Oklahoma.
In partnership with BlueScope Properties, GH2 Architects and Butler®, FCG builds a 258K sf state-of-the-art reconditioning center for Tricolor Automotive in Surprise, AZ.
Facet Filtration enlisted Fleming 8760 to execute a roof retrofit that would solve for leaks and connect roof planes to improve the overall appearance of the building.
FSE provides structural steel and roofing installation for Jarboe Sales’ 270k square foot distribution center.
Fleming Steel Erectors works through pandemic challenges to complete PEMB construction of USA BMX Headquarters on-time and on-budget.
Frito Lay’s new 83K square foot warehouse in Tulsa, OK, is the latest built-to-suit project in a long partnership between Industrial Developers of Oklahoma and the Fleming Construction Group.
Fleming erected the Butler MR-24® standing seam metal roofing system as part of 89K sq. ft. in highly complex updates to the Alfa Laval industrial building.
Fleming erected the structural steel and roof for Amazon’s new 300K sq. ft. Oklahoma City sortation center. The entire project from ground breaking to certificate of completion was finished in just eight months.
Fleming helped Braden Manufacturing update their roofing system following a tornado and shoddy repairs with a design that provides them with a 40+ year weathertight roof system and interior workspace enhancements.
Fleming completed the upgrade of Braden Shielding’s 45K sq. ft. facility, including updates to the building facade.
Fleming partnered with Industrial Developers of Oklahoma to erect the structural steel pre-engineered metal buildings on the 187-acre former Ford Glass Plant.
Fleming completed the structural steel and roofing portion of an Oklahoma City last mile distribution center for a widely recognized global e-commerce company, making the 120K sq. ft. project the fifth building partnership between Fleming and the client.
Originally constructed by FCG in 1969, Fleming returned to the Green Valley Center for roofing upgrades and modernization of the building facade.
Fleming provided the structural steel erection portion of the 140K sq. ft. Hahn Tulsa facility. The building was completed on time, with more than $500,000 in value-engineered savings.
Fleming is proud to have been a part of the construction of the first ever LEED Certified Land Rover automobile dealership.
The re-roof at Mill Creek Companies Grove, OK retail showroom and warehouse space marks the eighth reroof for a Mill Creek facility, totaling nearly 300K sq. ft. of improvements completed by Fleming for the company.
Fleming erected nearly 600K sq. ft. of structural steel for professional and retail spaces at the Regal Plaza Convention Center, encompassing a full city block within Bixby, OK.
Fleming erected the structural steel and standing seam roof portion of Skycam’s original 50K sq. ft. headquarters. The pre-engineered custom metal building was used for Skycam’s high-tech camera manufacturing, repair, testing, and marketing.
Originally built by The Fleming Construction Group, Fleming returned 45-years later to modernize the 120K sq. ft. Woodyard Properties’ industrial building.
The Fleming Construction Group is proud to announce it is the winner of the Oklahoma Association of General Contractors’ Build Oklahoma Award for the Industrial Projects Category, sized $10-20 Million.
The Fleming Construction Group has named FCG business development officer, Justin Willett as its new president.
The Fleming Construction Group is pleased to announce the Rainwater Construction Company has joined the FCG family of companies. Rainwater will serve as Fleming’s construction arm in the Southeast.
The United States needs more construction workers than it’s producing … Younger people will have to fill that gap—those just now choosing their careers, and those who will soon reach working age. In other words, Generation Z, people born between 1997 and 2012, will provide the construction workforce of tomorrow.
The roof of any commercial building is one of its most important elements. After all, that’s what protects everything underneath. But maintaining a roof properly can be a troublesome task—which makes it easy to neglect. Fortunately, recent advances in technology make roof maintenance easier and more efficient than ever. Here are some of the tools available today for keeping any roof in good shape.
Net zero construction is the way of the future. Here’s an overview of what it means and how it can benefit businesses, the environment, and people.
Data centers account for an ever-increasing share of new industrial construction. Here are three important things to keep in mind for anyone considering building a data center.
Safety training is an essential part of construction work. Virtual reality programs are making it more effective, more efficient—and more fun.
Closing out a construction project is a complex and time-intensive process. By planning ahead and following best practices, contractors can ensure a successful conclusion for all parties.
With the rapid expansion of information technology, data centers are springing up around the United States. To the surprise of some, Oklahoma is emerging as a prime location for major companies to locate their data centers.
It’s important for any general contractor to investigate the qualifications and competence of the subcontractors it works with. Here are some things to look at when considering any subcontractor for a commercial construction project.
Digital twins are making building design, construction, and operation much more accessible, transparent, convenient, efficient, and cost-effective. This overview describes some of the benefits of this innovative and evolving technology.
Net-zero construction is within reach even for large structures, including PEMB. This post highlights some of the innovations that are making today’s construction more energy-efficient than ever.
2023 was another banner year for growth and development for FCG. Get the highlights in our annual Year in Review.
A cost segregation study can be an invaluable tool for building owners seeking to maximize the tax benefits available to them. This article lays out some basic terms and principles of cost segregation.
OSHA 30 training is essential for anyone seeking a position of responsibility in the construction industry. This article explains what is involved in OSHA training, why it’s important, and how to get it.
Fleming Construction Group has been building in the commercial space for nearly eight decades. Here’s a project gallery spotlighting some of our favorite warehouse and distribution projects.
Sustainability is an important goal for all industries, and construction is no exception. Here’s how today’s building trade is contributing to a more sustainable infrastructure.
We’d like to take a moment to recap our recent construction awards and give credit to the many hard-working individuals that show up every day with the unwavering commitment to excellence that has made our success possible.
Location, Permits, Space Usage, Timelines… These are some common issues associated with building a warehouse.
In the construction industry, various types of glass are used for a wide range of purposes. Beyond its most obvious function (windows), glass is routinely used in staircases, doors, skylights, translucent roofs, interior curtain walls and more.
Every commercial, industrial or institutional building is a mini-ecosystem in itself. It has its own climate, lighting, water, and security apparatus—each of which affects the building’s energy usage and efficiency. Managing all these systems effectively can save tens of thousands of dollars annually in operational costs.
Find out the basics of supply chain risk management and learn the elements of a good risk management strategy.
Functionality is always the first requirement for any building design. But form is just important. In commercial building construction—large-scale tilt-wall buildings in particular—esthetic considerations are often minimized. But even in this realm, limitless opportunities exist for innovation and creative excellence.
With more than 75 years in the commercial construction industry, we’ve got a lot of projects under our belt – 70 million square feet’s worth, in fact. And many of them have been very large. From Walmart to Amazon to Vanguard, we build the spaces that keep American industry moving.
As energy prices soar, individuals and organizations are increasingly focused on energy efficiency. That makes sense from a cost-saving point of view, and it’s good for the environment. Fortunately, the outlook for more energy-efficient systems is brighter now than ever before.
Enhancing productivity, and therefore, profitability is the never-ending challenge for businesses of all types–and the commercial construction industry is no exception.
With thirty million-plus square feet of warehouse and distribution projects completed, and more than seventy million square feet in total construction, The Fleming Construction Group has expertise in all stages of construction contracting, management and implementation.
What is Building Information Modeling (BIM)? How can you use it to streamline your next building project?
The modern Made in the USA movement can help bring skilled jobs back to the US while helping secure supply chains in times of global crisis.
It can be tempting to push ahead with building schedules even when mother nature isn’t cooperating. But ignoring the dangers of harsh conditions is not wise. There are better ways to handle the challenges of inclement weather.
Before pushing full steam into a successful, prosperous 2023, we’d like to take a moment to reflect on the past year and share some of the highlights.
Excavators are essential for the construction of highways, tunnels, and bridges. They’re also especially useful for mining operations and the demolition of large structures.
Along with its own internal dynamics, the construction industry is subject to trends in the general economy, including inflation, recession, supply chain issues and workforce issues, among others.
AR and VR contribute to the construction fields at nearly every stage of the process, from delivering a higher level of visualization in the planning phases, to helping maintenance workers better understand the location of building systems.
Over the past several years, Fleming Construction Group (FCG) has continued to build its reputation for excellence in the construction industry and our efforts have not gone unnoticed.
Building codes are meant to protect public health and welfare, account for changes in product and process, and promote efficient building design.
Constructability reviews promote communication between teams, help identify design issues early, ensure timelines are realistic, and more.
With the integration of data gathering software, drones in the construction industry are now used in every stage of a build from pre-construction all the way through to ongoing building management.
In conjunction with Fleming 8760, Fleming Steel Erectors has installed more than 70-million square feet of Butler® standing seam metal roofing on some of the largest commercial buildings in Oklahoma.
Interested in industry topics like construction management, energy efficiency and job site safety? Visit the Fleming Construction Group blog.
Consider these points when evaluating a PEMB roofing partner.
From Amazon to Walmart to Vanguard, Fleming Steel Erectors provide the structural steel, PEMB and metal roofing installation services that keep industries moving forward.
This video explains the value-driven philosophy that differentiates Fleming Steel Erectors.
Building on its success in manufacturing, lean’s revolutionary methodology has been expanded and implemented in a variety of industries, including construction.
This video explains the complexities of construction materials management, and its power to positively or negatively impact every other aspect of a construction project.
This video provides basic PEMB terminology, including clear span and division 13.
Learn how PEMBs are proving to be the more sustainable choice for future construction.
Smart contracts have the potential to revolutionize the way the construction industry operates. This video provides some basics on how they work and why they have the potential to be so important.
The 2021 steel industry backlog is affecting PEMB. Find out what you need to know about projections, planning and timelines.
Total Cost of Ownership is important to the planning process because it gives owners insight into the lifetime cost of a building.